Tag: Arup
SA’s proposed seawater pumped hydro plant at Cultana reaches next stage
ARENA is providing a further $500,000 in funding to EnergyAustralia for the next stage of the 225 MW Cultana seawater pumped hydro plant in...
New study confirms viability of proposed seawater pumped hydro plant at Cultana
ARENA has released the results of the initial feasibility study that examined the practical viability of a proposed coastal pumped hydro plant for South...
Arup continues to push the limits of 3D printing for construction
Using the latest additive manufacturing techniques to design critical structural steel components for complex architectural projects, Arup engineers have created new structures that push...
Arup takes 3D printing into the real world with 3D printed steel elements
UK engineering firm Arup has developed a new method of designing and 3D printing steel joints in complex projects, and is on its way...